Bayliner 4788 "Hideaway" Delivered from Atlantic Yacht Basin to Calvert Marina
April 8 - 10, 2011

Back     Home


On Friday, April 8, 2011, Matt, Kevin, Jim and I drove to Atlantic Yacht Basin in Chesapeake, VA to deliver Bayliner 4788 "Hideaway" to Calvert Marina in Solomons, MD. We checked out the boat, had dinner and stayed on board Friday night.

At 0730 Saturday morning we were underway. The weather was cool and overcast. We proceeded under the Great Bridge draw bridge and passed through the Great Bridge lock. Then under three more draw bridges as we proceeded up the Elizabeth River toward Norfolk. From there we passed over the Hampton Bridge Tunnel and into the Chesapeake. As we turned east into the bay, waves increased to 2 - 3' and occasionally 4 feet. Hideaway rode great at ~ 14.5 knots/2400 RPM.  The further north we got in the Bay, the smoother the conditions were. We approached Solomons at ~1730. As we entered we checked the port and stbd transmission shift levers to be sure we had control - we did. As we approached the shed at Calvert, the stbd transmission would not shift out of forward into neutral or astern. Digger secured the stbd engine end cautiously moved us toward the T head on H dock. Upon arrival, we secured the boat on H dock. Was good to have Hideaway safely delivered to Solomons.

On Sunday morning, paul and Kim rode their motorcycle down to visit and see the boat. paul and I crawled  into the engine room and made a field expedient, temporary repair to the stbd transmission shift linkage. Two tie-ties held the linkage securely in place. We op checked the shifter several time at the pier and elected to move the boat to the shed. thought it was better to do while I had help. We made the move to the shed slowly and without any problems. We connected shore power and secured the boat. Hideaway is now safely at her slip at Calvert Marina.


Saturday morning breakfast on board. That's decaffeinated coffee - I was loudly chastised!






Departing AYB and pulling into the ICW


Digger at the helm


Approaching the Great Bridge draw bridge


AYB behind us


Approaching the Great Bridge lock - a 6" lift











Through Portsmouth and Norfolk













Into the Bay





2400 RPM


14.3 knots






Kevin at the helm





Safe arrival at Calvert Marina


The crew: Kevin, Matt, Jim and Steve


New owners







Stbd transmission shift linkage - supposed to be connected


Kim and Paul on Sunday morning


A little too long for the shed








Hideaway safely in the shed



Paul and Steve




Atllantic Yacht Basin to Calvert Marina - 114 NM

Google Earth KML

Back     Home